Here are some of the recent ICF projects we have
handled in the southeast.
Follow our latest project in Montezuma, GA the
Bliven home a 4000 sq ft Geothermal
ICF basement home being built using the SpeedFloor system. This slab was
poured using the Fab Form system, you find the link on the link page.

Here are the pictures of the house just
pumped in Barney, GA. It is about 4150 sq ft and took 58 not 68 yds. of
concrete. there were no problems.



1885 sq. ft. per floor Macon 2004 using
Nudura forms. Viewed from rear showing the walk out basement.
Owner contracted.

This is a 1400 Sq. Ft. commercial office
in St. Simons Island
that was done with Nudura about 16 months ago. It has "real stucco"
applied to the blocks. It has a crawl space w/wood floor system in
place. The owner "didn't want to have to have to pack up all his
records" every time they get an evacuation notice. The windows are
"impact resistant" windows. You can see the "Anchor
Hanger System" being used to install the floor system.


Duplex in Hagen, GA. Finished in five
days using Nudura forms, started 4/15/05 occupied in 90 days. Rented both
units first week after the open house.

This wall is the fire wall that
separates the two units. It is 17' 6" tall, and it was
all poured the same day.

Hotel Project

ICF Home
in Georgia done by Advanced Building Techniques

This house
was finished with
GrailCoat

|